Search results

1 – 1 of 1
Article
Publication date: 21 September 2021

Navid Nazhand, Reza Dashti and Abolfazl Ahmadi

The purpose of this paper is to describe a novel method to compromise between planned (regulated) maintenance and outage initiation and unplanned (unregulated) maintenance and to…

Abstract

Purpose

The purpose of this paper is to describe a novel method to compromise between planned (regulated) maintenance and outage initiation and unplanned (unregulated) maintenance and to find an economic model using which one can perform maintenance adequately and in the most optimal state.

Design/methodology/approach

In this paper, a system consisting of similar components is considered, and the role of each component in the system is explained. Then, the cost pertaining to failure in each asset is determined. Costs such as energy not supplied, penalties, human resources to resolve the defect and replacing assets are taken into account. Finally, a new comprehensive objective is proposed, and optimization is performed for a sample system.

Findings

In this paper, some graphs have been plotted from which plenty of information may be extracted. This is mentioned in the Conclusion.

Originality/value

In this paper, some graphs have been plotted from which plenty of information may be extracted. This is mentioned in the Conclusion.

Details

Journal of Quality in Maintenance Engineering, vol. 28 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

1 – 1 of 1